News

Sarah Long Bridge closed 2 – 4 weeks

The Sarah Long Bridge in Portsmouth will remain closed two to four weeks to repair the damage caused when a 473-foot tanker hit the bridge Monday afternoon. Transportation officials say four vertical trusses need to be fixed and holes opened up in the walkway when a crane on the tanker lifted a section of the bridge while the tide was rising.  The bridge was shut down after a tanker broke free from the state pier and became lodged against the bridge. Ships will still be able to travel up and down the river because the center span can be raised.

Recent Headlines

in Entertainment

This weekend in entertainment history

mondaynight

A look back on the Hollywood headlines that made history.

in Entertainment

It’s been 30 years since ‘The Cosby Show’ debuted

cosby

Here are some of our favorite moments from one of America's favorite TV families.

in Music

New Queen album features Michael Jackson collaboration

25-overlay3

The track features vocals from late Queen frontman Freddie Mercury and the King of Pop.

in Lifestyle

Being a couch potato could cause depression

tv

A new analysis ties too much sitting at the computer or lying around watching TV to a greater risk of depression.

in Entertainment

Jennifer Garner’s life ‘too boring’ for Instagram

jennifer

The "Dallas Buyers Club" actress is adamant she won't join her husband, actor Ben Affleck, on Twitter either.

Weather

condition Condition: Clear/Sunny
Temperature: 57°
High: 79° - Low: 59°